Design basis for a spray-bake automatic painting production line

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2019-05-11 17:52
  • Views:

(Summary description)This project is a spray-bake automatic painting production line, which is planned according to the customer's process flow, product size, production, coating properties, curing time and temperature. The planning and layout of the project fully consider production, people flow, logistics, production tempo, and take into account the convenience of equipment maintenance, the purpose is to improve operational efficiency, improve product quality, and can significantly reduce production costs and reduce pollutant emissions, Thereby improving the market competitiveness of products. The one spray-bake coating line project mainly includes chain-type table conveyor system, electrostatic dust removal system, automatic spraying system, coating baking system, exhaust gas treatment system, dust-free compartment, and workpiece rotation system. The design of the wire body is mainly determined according to the workpiece. The material of the workpiece is plastic parts. The size of the workpiece is Φ60-230mm. The product conveying mode is countertop continuous conveying. The spraying operation mode is reciprocating mechanism or 4-axis 6-axis mechanism online. Automatic spraying, the process speed is at least 3.0m/min (1-5m/min variable frequency adjustable), the distance between fixtures is 101.6mm; (parameter adjustment needs to be filed). The automatic spraying equipment in the spraying line is composed of five parts, namely automatic dusting cabinet, automatic spraying chamber, curing furnace, cooling room, spray gun system and total system. The temperature, humidity and cleanliness control of each process is also very important. For example, the baking zone is equipped with far-infrared electric heating, up to 80 °C, and the cleanliness is 10,000. The electrostatic precipitator area and the spray area and the cooling area are relatively clean. Lower, more than 10,000 can be, and the upper and lower parts of the area require a higher level of cleanliness, requiring 100,000. Of course, the cleanliness of the paint shop is mainly based on the customer's process requirements.

Design basis for a spray-bake automatic painting production line

(Summary description)This project is a spray-bake automatic painting production line, which is planned according to the customer's process flow, product size, production, coating properties, curing time and temperature. The planning and layout of the project fully consider production, people flow, logistics, production tempo, and take into account the convenience of equipment maintenance, the purpose is to improve operational efficiency, improve product quality, and can significantly reduce production costs and reduce pollutant emissions, Thereby improving the market competitiveness of products. The one spray-bake coating line project mainly includes chain-type table conveyor system, electrostatic dust removal system, automatic spraying system, coating baking system, exhaust gas treatment system, dust-free compartment, and workpiece rotation system. The design of the wire body is mainly determined according to the workpiece. The material of the workpiece is plastic parts. The size of the workpiece is Φ60-230mm. The product conveying mode is countertop continuous conveying. The spraying operation mode is reciprocating mechanism or 4-axis 6-axis mechanism online. Automatic spraying, the process speed is at least 3.0m/min (1-5m/min variable frequency adjustable), the distance between fixtures is 101.6mm; (parameter adjustment needs to be filed). The automatic spraying equipment in the spraying line is composed of five parts, namely automatic dusting cabinet, automatic spraying chamber, curing furnace, cooling room, spray gun system and total system. The temperature, humidity and cleanliness control of each process is also very important. For example, the baking zone is equipped with far-infrared electric heating, up to 80 °C, and the cleanliness is 10,000. The electrostatic precipitator area and the spray area and the cooling area are relatively clean. Lower, more than 10,000 can be, and the upper and lower parts of the area require a higher level of cleanliness, requiring 100,000. Of course, the cleanliness of the paint shop is mainly based on the customer's process requirements.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2019-05-11 17:52
  • Views:
Information

This project is a spray-bake automatic painting production line, which is planned according to the customer's process flow, product size, production, coating properties, curing time and temperature. The planning and layout of the project fully consider production, people flow, logistics, production tempo, and take into account the convenience of equipment maintenance, the purpose is to improve operational efficiency, improve product quality, and can significantly reduce production costs and reduce pollutant emissions, Thereby improving the market competitiveness of products.

 

The one spray-bake coating line project mainly includes chain-type table conveyor system, electrostatic dust removal system, automatic spraying system, coating baking system, exhaust gas treatment system, dust-free compartment, and workpiece rotation system. The design of the wire body is mainly determined according to the workpiece. The material of the workpiece is plastic parts. The size of the workpiece is Φ60-230mm. The product conveying mode is countertop continuous conveying. The spraying operation mode is reciprocating mechanism or 4-axis 6-axis mechanism online. Automatic spraying, the process speed is at least 3.0m/min (1-5m/min variable frequency adjustable), the distance between fixtures is 101.6mm; (parameter adjustment needs to be filed).

The automatic spraying equipment in the spraying line is composed of five parts, namely automatic dusting cabinet, automatic spraying chamber, curing furnace, cooling room, spray gun system and total system. The temperature, humidity and cleanliness control of each process is also very important. For example, the baking zone is equipped with far-infrared electric heating, up to 80 °C, and the cleanliness is 10,000. The electrostatic precipitator area and the spray area and the cooling area are relatively clean. Lower, more than 10,000 can be, and the upper and lower parts of the area require a higher level of cleanliness, requiring 100,000. Of course, the cleanliness of the paint shop is mainly based on the customer's process requirements.